EPISODE · Sep 13, 2026 · 1 MIN
Coastal Restoration & Cedar Point Ramp | Birmingham News
from Birmingham AL News Today | 2 Min News | The Daily News Now!
Mobile County is rolling out major coastal wins: Phase two of the Dauphin Island Causeway Restoration is done, and phase three—building a resilient marsh platform with tidal creeks and grasses—is underway, set for completion in 2027. Meanwhile, the Salt Aire Shoreline project, funded by the National Fish and Wildlife Foundation, is ramping up with temporary banks made from dredged material, aiming to finish in ten months. And at Cedar Point, a $6.5 million boat ramp—complete with a two-lane launch, finger piers, and oyster management station—is under construction, thanks to a state grant, to boost safety and access for commercial oyster operations and open next summer. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Sources:https://1819news.com/news/item/mobile-county-coastal-restoration-boat-ramp-projects-underway More coverage & latest updates:https://sources.thednn.ai/58aa775dfde62431 Report issues to [email protected].
Embed this episode
Ready to play
Coastal Restoration & Cedar Point Ramp | Birmingham News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.