Coming Soon: Better Buses in Boise, Idaho: Episode 77 episode artwork

EPISODE · May 22, 2024 · 34 MIN

Coming Soon: Better Buses in Boise, Idaho: Episode 77

from The Red Line Podcast

Today, we're returning to the transit-challenged hometown of Host #1, Boise, Idaho. Just why is it so hard for them to succeed where other red state capitals have, and what's their path forward? All this, after The News. Follow along with the before and after maps of the VRT bus system: before after Links and stuffs Merch:https://shop.trlpod.com/ Twitter:@TheRedLine_pod YouTube channel:The Red Line Podcast Spotify:The Red Line Podcast Patreon:https://www.patreon.com/theredlinepodcasters Email:[email protected] Website:https://www.trlpod.com/ Timestamps References & notes [1]BoiseDev: Caldwell decides not to fund added VRT bus route [2]BoiseDev: McLean not high on rail dream for Downtown Boise circulator [3]COMPASS: Treasure Valley High Capacity Transit Study, 2020 Update [4]Valley Regional Transit: Better Bus 2024 [5]Valley Regional Transit: Redesigned bus route map [6]Valley Regional Transit: May 2023 system map [7]FTA: Valley Regional Transit 2022 Annual Agency Profile [8]Mass Transit: PA: Multiyear $150M light rail upgrades begin this week

Episode metadata supplied by the publisher feed · Published May 22, 2024

Embed this episode

Ready to play

Coming Soon: Better Buses in Boise, Idaho: Episode 77

0:00 34:14

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Red Line Podcast?

This episode is 34 minutes long.

When was this The Red Line Podcast episode published?

This episode was published on May 22, 2024.

Can I download this The Red Line Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!