Skip to content
Construction Engineering episode artwork

EPISODE · Feb 28, 2022 · 19 MIN

Construction Engineering

from WoodSolutions Timber Talks

As we're continuing to innovate and build taller timber buildings, the installation process is sometimes an afterthought. With good planning, the installation can be de-risked and improve the overall program. In this episode, we're speaking with Lincoln Ladds who is an Associate Engineer at TTW about: The challenges around mixing materials on a project The temporary works design considerations And major lessons learned in construction engineering for the projects he's been part of If you want to learn more about designing or building with timber, I recommend you go to the WoodSolutions Website and download the Technical Design Guides: https://www.woodsolutions.com.au/publications I recommend watching the WoodSolutions weekly webinars. Previous recordings can be found on the WoodSolutions website: https://woodsolutions.com.au/

Episode metadata supplied by the publisher feed · Published Feb 28, 2022

Embed this episode

Ready to play

Construction Engineering

0:00 19:54

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of WoodSolutions Timber Talks?

This episode is 19 minutes long.

When was this WoodSolutions Timber Talks episode published?

This episode was published on February 28, 2022.

Can I download this WoodSolutions Timber Talks episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!