Skip to content
Construction Nuts and Bolts: Future John Nolen Drive episode artwork

Jan 26, 2022 24 min

Construction Nuts and Bolts: Future John Nolen Drive

from Madison's Everyday Engineering

John Nolen Drive— it needs some improvements in the City of Madison, and the public planning process began in 2021, which is years before any digging or disruption happens. However, it’s not that easy getting to the construction phase, especially fo the people in charge of designing and re-imagining the most popular street in the community. City of Madison Engineering Division Public Information Officer Hannah Mohelnitzky hosts the two people tasked with hard jobs leading teams on the generational project: City of Madison Engineering Division Principal Engineer and Section Manager Chris Petykowski and City of Madison Parks Division Landscape Architect Mike Sturm. Learn how the City’s most-traveled path accommodates bikes, pedestrians and vehicles — and how it’ll all change with reconstruction fused with a brand new vision for the waterfront.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Construction Nuts and Bolts: Future John Nolen Drive

0:00 24:13

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Madison's Everyday Engineering?

This episode is 24 minutes long.

When was this Madison's Everyday Engineering episode published?

This episode was published on January 26, 2022.

Can I download this Madison's Everyday Engineering episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.