Skip to content
Construction Timelines For Philadelphia Megadevelopment episode artwork

Sep 22, 2020 6 min

Construction Timelines For Philadelphia Megadevelopment

from Elevator World Hosted by Elevator World

Welcome to the Elevator World News Podcast. Today’s podcast news podcast is sponsored by elevatorbooks.com: www.elevatorbooks.com CONSTRUCTION TIMELINES FOR PHILADELPHIA MEGADEVELOPMENT Construction timelines for a trio of 28-, 34- and 14-story towers making up the Schuylkill Yards megadevelopment in West Philadelphia's University City have been released, Philadelphia YIMBY reports. The first building scheduled to break ground is a 28-story tower at 3025 John F. Kennedy Boulevard. Aiming to break ground this fall and be complete in 2023, the structure will feature a "sleek gray façade" that will stand out on the Philadelphia skyline. After it's completed, the tallest, 34-story tower is set to break ground at 3001 John F. Kennedy Boulevard, with the third, 14-story tower expected to break ground around the same time. Brandywine Realty Trust is the developer of the project, with 6 million ft2 of residential, commercial, retail, green and laboratory spaces on the drawing board. Image credit: courtesy of SHoP Architects and West 8 Urban Design To read the full transcript of today's podcast, visit: elevatorworld.com/news Subscribe to the Podcast: iTunes │ Google Play | SoundCloud │ Stitcher │ TuneIn

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Construction Timelines For Philadelphia Megadevelopment

0:00 6:41

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Elevator World?

This episode is 6 minutes long.

When was this Elevator World episode published?

This episode was published on September 22, 2020.

Can I download this Elevator World episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.