Skip to content
Construction Update On Nyc Upper West Side’s Tallest episode artwork

Dec 11, 2019 6 min

Construction Update On Nyc Upper West Side’s Tallest

from Elevator World Hosted by Elevator World

Welcome to the Elevator World News Podcast. Today’s podcast news podcast is sponsored by elevatorbooks.com: www.elevatorbooks.com CONSTRUCTION UPDATE ON NYC UPPER WEST SIDE’S TALLEST New York YIMBY says construction on what would be the tallest tower on NYC’s Upper West Side could restart in early 2020. Designed by Snøhetta and developed by Extell, the 775-ft-tall residential skyscraper at 50 West 66th Street progressed quickly in 2019 but stalled recently; currently, materials such as rebar and scaffolding are onsite waiting for progress to resume. The site is between West 65th and West 66th streets, within sight of Extell’s Central Park Tower, and within walking distance of the west side of Central Park, numerous restaurants and a Whole Foods Market. Image credit: By Michael Young for New York YIMBY To read the full transcript of today's podcast, visit: elevatorworld.com/news Subscribe to the Podcast: iTunes │ Google Play | SoundCloud │ Stitcher │ TuneIn

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Construction Update On Nyc Upper West Side’s Tallest

0:00 6:13

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Elevator World?

This episode is 6 minutes long.

When was this Elevator World episode published?

This episode was published on December 11, 2019.

Can I download this Elevator World episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.