Construction Update On Nyc Upper West Side’s Tallest episode artwork

EPISODE · Dec 11, 2019 · 6 MIN

Construction Update On Nyc Upper West Side’s Tallest

from Elevator World · host Elevator World

Welcome to the Elevator World News Podcast. Today’s podcast news podcast is sponsored by elevatorbooks.com: www.elevatorbooks.com CONSTRUCTION UPDATE ON NYC UPPER WEST SIDE’S TALLEST New York YIMBY says construction on what would be the tallest tower on NYC’s Upper West Side could restart in early 2020. Designed by Snøhetta and developed by Extell, the 775-ft-tall residential skyscraper at 50 West 66th Street progressed quickly in 2019 but stalled recently; currently, materials such as rebar and scaffolding are onsite waiting for progress to resume. The site is between West 65th and West 66th streets, within sight of Extell’s Central Park Tower, and within walking distance of the west side of Central Park, numerous restaurants and a Whole Foods Market. Image credit: By Michael Young for New York YIMBY To read the full transcript of today's podcast, visit: elevatorworld.com/news Subscribe to the Podcast: iTunes │ Google Play | SoundCloud │ Stitcher │ TuneIn

Episode metadata supplied by the publisher feed · Published Dec 11, 2019

Embed this episode

NOW PLAYING

Construction Update On Nyc Upper West Side’s Tallest

0:00 6:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevator World?

This episode is 6 minutes long.

When was this Elevator World episode published?

This episode was published on December 11, 2019.

Can I download this Elevator World episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!