EPISODE · Sep 26, 2026 · 2 MIN
Contingencia en SPEC: Ministerio de Minas entregó balance del primer día y el abastecimiento
from La FM Noticias Colombia · host RCN Radio
Las obras por la contigencia continuarán hasta el 1ro de octubre de 2026.
Embed this episode
Ready to play
Contingencia en SPEC: Ministerio de Minas entregó balance del primer día y el abastecimiento
0:00
2:27
1×
No transcript for this episode yet
Similar Episodes
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of La FM Noticias Colombia?
This episode is 2 minutes long.
When was this La FM Noticias Colombia episode published?
This episode was published on September 26, 2026.
Can I download this La FM Noticias Colombia episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!