Skip to content
Continuing Safety Problems with New WIPP Shaft episode artwork

EPISODE · Apr 23, 2024 · 4 MIN

Continuing Safety Problems with New WIPP Shaft

from CCNS Update · host CCNS

Recent monthly reports by the Defense Nuclear Facilities Safety Board relate disturbing stories about near-miss operational incidents in the fifth shaft, under construction, at the Waste Isolation Pilot Plant (WIPP). The underground federal radioactive waste disposal site is located 2,150 feet below ground surface in a salt formation almost 30 miles east of Carlsbad, New Mexico. The Board has reported broken cables, misaligned transport platforms for workers to reach the underground, and workers stuck in the new shaft.

Episode metadata supplied by the publisher feed · Published Apr 23, 2024

Embed this episode

Ready to play

Continuing Safety Problems with New WIPP Shaft

0:00 4:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of CCNS Update?

This episode is 4 minutes long.

When was this CCNS Update episode published?

This episode was published on April 23, 2024.

Can I download this CCNS Update episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!