Contrato LUMA Energy debe cancelarse si NO es el mejor negocio para la AEE. episode artwork

EPISODE · Oct 13, 2020 · 16 MIN

Contrato LUMA Energy debe cancelarse si NO es el mejor negocio para la AEE.

from TERTULIANDO CON RAFA · host RAFAEL ANGEL PEREZ COLON

El ex director ejecutivo AEE, Ing. Josué Colón reacciona a la intención de cancelar el contrato de LUMA Energy con AEE si Charlie Delgado PPD asume gobernación en Puerto Rico.

Episode metadata supplied by the publisher feed · Published Oct 13, 2020

Embed this episode

NOW PLAYING

Contrato LUMA Energy debe cancelarse si NO es el mejor negocio para la AEE.

0:00 16:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of TERTULIANDO CON RAFA?

This episode is 16 minutes long.

When was this TERTULIANDO CON RAFA episode published?

This episode was published on October 13, 2020.

Can I download this TERTULIANDO CON RAFA episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!