Corner-Grounded Delta System (Grounded B Phase) episode artwork

EPISODE · Sep 26, 2024 · 23 MIN

Corner-Grounded Delta System (Grounded B Phase)

from "Ask the Lady Electrical Inspector ” Bi-Weekly Podcast Hosted by Tabatha L.

In episode 17, Tabatha L discusses common reasons corner-grounded delta systems (Grounded B Phase) fail electrical inspection.

NOW PLAYING

Corner-Grounded Delta System (Grounded B Phase)

0:00 23:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of "Ask the Lady Electrical Inspector ” Bi-Weekly Podcast Hosted by Tabatha L.?

This episode is 23 minutes long.

When was this "Ask the Lady Electrical Inspector ” Bi-Weekly Podcast Hosted by Tabatha L. episode published?

This episode was published on September 26, 2024.

What is this episode about?

In episode 17, Tabatha L discusses common reasons corner-grounded delta systems (Grounded B Phase) fail electrical inspection.

Can I download this "Ask the Lady Electrical Inspector ” Bi-Weekly Podcast Hosted by Tabatha L. episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!