EPISODE · May 23, 2025 · 12 MIN
Cost Of Building Metrolink Could Rise Further
from The Last Word with Matt Cooper
The latest cost estimate for building Dublin’s Metrolink was approximately €23 billion. However, could that figure now be too low?Work is set to start in 2026, with its completion estimated to be in the mid-2030s.Dr. Sean Sweeney, Programme Director of Metrolink spoke to Matt on The Last Word.Hit the ‘Play’ button on this page to hear the conversation.
Embed this episode
NOW PLAYING
Cost Of Building Metrolink Could Rise Further
0:00
12:22
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of The Last Word with Matt Cooper?
This episode is 12 minutes long.
When was this The Last Word with Matt Cooper episode published?
This episode was published on May 23, 2025.
Can I download this The Last Word with Matt Cooper episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!