Credlin, Thursday 29 September
from Credlin Hosted by News24
Palaszczuk moves to dump coal, AGL pulls the plug on the state's main power plant even though there's no replacement, plus, an Albanese Government frontbencher may have misled parliament over her failure to disclose share dividends.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of Credlin?
This episode is 49 minutes long.
When was this Credlin episode published?
This episode was published on September 29, 2022.
Can I download this Credlin episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.