Cristo Redentor Tunnel Reopens After 34-Day Closure | Bermuda News episode artwork

EPISODE · Aug 19, 2026 · 1 MIN

Cristo Redentor Tunnel Reopens After 34-Day Closure | Bermuda News

from Bermuda News Today | 2 Min News | The Daily News Now!

The Cristo Redentor tunnel, Argentina and Chile’s vital mountain link, has reopened after a record 34-day closure due to brutal snow and wind—eight days longer than last year. Hundreds of trucks stranded for over a month are finally moving again, with Argentine vehicles going first. This El Niño-driven chaos highlights nature’s power in the Andes, and scientists warn it could intensify through early 2027, bringing floods to Peru and Brazil—and more snowstorms to the mountains. Relief for trade, but watch out: this kind of disruption may become the new normal. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/c882251ffb736595

Episode metadata supplied by the publisher feed · Published Aug 19, 2026

Embed this episode

NOW PLAYING

Cristo Redentor Tunnel Reopens After 34-Day Closure | Bermuda News

0:00 1:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Bermuda News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Bermuda News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on August 19, 2026.

Can I download this Bermuda News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!