EPISODE · Aug 19, 2026 · 1 MIN
Cristo Redentor Tunnel Reopens After 34-Day Closure | Bermuda News
from Bermuda News Today | 2 Min News | The Daily News Now!
The Cristo Redentor tunnel, Argentina and Chile’s vital mountain link, has reopened after a record 34-day closure due to brutal snow and wind—eight days longer than last year. Hundreds of trucks stranded for over a month are finally moving again, with Argentine vehicles going first. This El Niño-driven chaos highlights nature’s power in the Andes, and scientists warn it could intensify through early 2027, bringing floods to Peru and Brazil—and more snowstorms to the mountains. Relief for trade, but watch out: this kind of disruption may become the new normal. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/c882251ffb736595
Embed this episode
NOW PLAYING
Cristo Redentor Tunnel Reopens After 34-Day Closure | Bermuda News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.