Critical Path by R. Buckminster Fuller, Kiyoshi Kuromiya episode artwork

EPISODE · Mar 26, 2021 · 15H 47M

Critical Path by R. Buckminster Fuller, Kiyoshi Kuromiya

from Ignite A Full Audiobook That Is Simply Next-Level. · host R. Buckminster Fuller, Kiyoshi Kuromiya

https://thebookvoice.com/podcasts/2/audible/99 to listen full audiobooks. Title: Critical Path Author: R. Buckminster Fuller, Kiyoshi Kuromiya Narrator: Alister Austin Format: mp3 Length: 15 hrs and 47 mins Release date: 03-26-21 Ratings: 4 out of 5 stars, 69 ratings Genres: Architecture Publisher's Summary: Critical Path is Fuller's master work - the summing up of a lifetime's thought and concern - as urgent and relevant as it was upon its first publication in 1981. Critical Path details how humanity found itself in its current situation - at the limits of the planet's natural resources and facing political, economic, environmental, and ethical crises.

Episode metadata supplied by the publisher feed · Published Mar 26, 2021

Embed this episode

NOW PLAYING

Critical Path by R. Buckminster Fuller, Kiyoshi Kuromiya

0:00 15:47:00

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Ignite A Full Audiobook That Is Simply Next-Level.?

This episode is 15 hours and 47 minutes long.

When was this Ignite A Full Audiobook That Is Simply Next-Level. episode published?

This episode was published on March 26, 2021.

Can I download this Ignite A Full Audiobook That Is Simply Next-Level. episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!