CTfastrak - The Most Jacked BRT Ever: Episode 96 episode artwork

EPISODE · Dec 4, 2024 · 59 MIN

CTfastrak - The Most Jacked BRT Ever: Episode 96

from The Red Line Podcast

Today, we're discussing CTfastrak, which may be the most intense BRT route in the country. We'll talk feeders, speeders, and something else that ends with feeders after The News. Links and stuffs Merch:https://shop.trlpod.com/ Twitter:@TheRedLine_pod YouTube channel:The Red Line Podcast Spotify:The Red Line Podcast Patreon:https://www.patreon.com/theredlinepodcasters Email:[email protected] Website:https://www.trlpod.com/ Timestamps References & notes [1]Mass Transit: California youth launch California High School Transit Alliance to take on transit issues [2]CT News Junkie: Transportation Chief Offers Vision For Light Rail [3]Wikipedia: CT Fastrak § Hartford Line [4]New Britain – Hartford Busway; Central Connecticut [5]Institute for Transportation and Development Policy: Connecticut's CTfastrak BRT a Success [6]CTtransit: About CTfastrak [7]CTDOT: Testing and Deployment of Automated Buses on CTfastrak [8]Mass Transit: CT: CTfastrak rebounding from pandemic dip in ridership as it turns 10 [9]CTtransit: About CTfastrak [10]Connecticut Public: How a Busway Might Change Connecticut's Commuter Culture

Episode metadata supplied by the publisher feed · Published Dec 4, 2024

Embed this episode

Ready to play

CTfastrak - The Most Jacked BRT Ever: Episode 96

0:00 59:04

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Red Line Podcast?

This episode is 59 minutes long.

When was this The Red Line Podcast episode published?

This episode was published on December 4, 2024.

Can I download this The Red Line Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!