EPISODE · Jun 22, 2026 · 8 MIN
Cumberland Fossil Plant: $46 million to extend life of polluting coal-fired power plant
La Cumberland Fossil Plant in Tennessee, giÃÂÃÂ condannata per ripetute violazioni ambientali, riceve 46 milioni di dollari per prolungare la sua operativitÃÂÃÂ . La decisione, in contrasto con gli obiettivi di decarbonizzazione, solleva preoccupazioni per la salute pubblica e l'accelerazione del cambiamento climatico.
Embed this episode
NOW PLAYING
Cumberland Fossil Plant: $46 million to extend life of polluting coal-fired power plant
0:00
8:36
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of GoYou Technology (EN)?
This episode is 8 minutes long.
When was this GoYou Technology (EN) episode published?
This episode was published on June 22, 2026.
Can I download this GoYou Technology (EN) episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!