Dakota Access shutdown and the future of US midstream projects episode artwork

EPISODE · Jul 13, 2020 · 23 MIN

Dakota Access shutdown and the future of US midstream projects

from Capitol Crude: The US Energy Policy Podcast

Last week delivered some huge news on the pipeline front that highlights the challenges ahead for the US midstream sector and the fate of future efforts to build multi-state energy projects. First Duke Energy and Dominion Energy announced they were canceling the Atlantic Coast natural gas pipeline after already spending more than $3 billion on it. Then a federal judge ordered Energy Transfer to shut down the Dakota Access crude pipeline and empty it of oil by August 5 while the Army Corps of Engineers conducts a more extensive environmental review. Finally, the Supreme Court said the Army Corps can resume a fast-track permitting process called the Nationwide Permit 12 -- on all pipelines except for TC Energy's Keystone XL heavy crude pipeline from Canada, extending the more than decade-long uncertainty for that project. James Coleman, an energy law professor at Southern Methodist University, joins us to walk through the possible scenarios for Dakota Access in the next month, as well as the broader uncertainty hanging over the midstream sector and the major shift in US pipeline regulation expected if Joe Biden beats President Trump in November.

NOW PLAYING

Dakota Access shutdown and the future of US midstream projects

0:00 23:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

Frequently Asked Questions

How long is this episode of Capitol Crude: The US Energy Policy Podcast?

This episode is 23 minutes long.

When was this Capitol Crude: The US Energy Policy Podcast episode published?

This episode was published on July 13, 2020.

What is this episode about?

Last week delivered some huge news on the pipeline front that highlights the challenges ahead for the US midstream sector and the fate of future efforts to build multi-state energy projects. First Duke Energy and Dominion Energy announced they were...

Can I download this Capitol Crude: The US Energy Policy Podcast episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!