Data Center vs Drinking Water | Lexington News episode artwork

EPISODE · Sep 3, 2026 · 1 MIN

Data Center vs Drinking Water | Lexington News

from Lexington News Today | 2 Min News | The Daily News Now!

A $12 billion data center project threatens Ashland’s drinking water supply, as its critical raw water intake lines run through the proposed site—a former steel plant. City officials are now considering eminent domain to secure the land, prioritizing public safety over economic gain. While the developer, Rubix Data Centers, plans most of the facility in neighboring Russell, Ashland’s new regulations and readiness to act could force a showdown between tech investment and essential infrastructure. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/0b293e1b0f66066c

Episode metadata supplied by the publisher feed · Published Sep 3, 2026

Embed this episode

Ready to play

Data Center vs Drinking Water | Lexington News

0:00 1:52

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Lexington News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Lexington News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on September 3, 2026.

Can I download this Lexington News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!