Data centers pull coal, PJM reform, and grid software into one fight — August 16, 2026 episode artwork

EPISODE · Aug 16, 2026 · 9 MIN

Data centers pull coal, PJM reform, and grid software into one fight — August 16, 2026

from The Data Center Daily · host The Data Center Daily — Lantern Podcasts

Evergy’s data-center load push is tied to keeping 2.8 GW of coal online longer, while FERC opens another PJM reform lane and grid-software vendors pitch more capacity from existing wires. The buildout is turning every bottleneck into policy and capital. In this episode: Top stories: 1. In the Midwest, more coal power for data centers | Latitude Media — Latitude Media https://www.latitudemedia.com/news/in-the-midwest-more-coal-power-for-data-centers/ 2. PJM Governance and Stakeholder Reforms; Notice Regarding Dispute Resolution Procedures | 91 FR 52301 — Federal Register https://thefederalregister.org/documents/2026-16522/pjm-governance-and-stakeholder-reforms-notice-regarding-dispute-resolution-procedures 3. Utility Dive explores OATI’s plan to boost transmission capacity — Utility Dive https://www.oati.com/news/powernow-transmission-capacity/ 4. Centuria, ResetData advance AI data centre rollout | Financial Standard — Financial Standard https://www.financialstandard.com.au/news/centuria-resetdata-advance-ai-data-centre-rollout-179813600 5. CVC DIF to acquire leading German data centre operator firstcolo from Cube Infrastructure Managers | CVC — CVC https://www.cvc.com/media/news/2026/cvc-dif-to-acquire-leading-german-data-centre-operator-firstcolo-from-cube-infrastructure-managers/ Follow and rate The Data Center Daily on Apple Podcasts or Spotify. Feedback? Email [email protected]

Episode metadata supplied by the publisher feed · Published Aug 16, 2026

Embed this episode

Ready to play

Data centers pull coal, PJM reform, and grid software into one fight — August 16, 2026

0:00 9:34

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Data Center Daily?

This episode is 9 minutes long.

When was this The Data Center Daily episode published?

This episode was published on August 16, 2026.

Can I download this The Data Center Daily episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!