Dave Southall - Light Lines, Long Leaders and Small Flies episode artwork

EPISODE · Jun 21, 2023 · 1H 11M

Dave Southall - Light Lines, Long Leaders and Small Flies

from The Fly Culture Podcast · host Pete Tyjas

Send us Fan MailI talk with Dave Southall about why he likes to fish with light lines and small flies.We also talk about hatches along with a caddis fly that I learnt a lot about.He also has lots of fishing tips that make fishing small flies a lot easier.This episode is packed with information that you'll find useful.

Episode metadata supplied by the publisher feed · Published Jun 21, 2023

Embed this episode

Ready to play

Dave Southall - Light Lines, Long Leaders and Small Flies

0:00 1:11:07

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Fly Culture Podcast?

This episode is 1 hour and 11 minutes long.

When was this The Fly Culture Podcast episode published?

This episode was published on June 21, 2023.

Can I download this The Fly Culture Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!