EPISODE · Apr 23, 2020 · 10 MIN
Dear Owner, No Change Orders Thank You
from Build America Podcast · host Scott Jennings
Most Project Owners are convinced that Contractors thrive on change orders. The truth is that most would prefer to have none. Read below a sort of open letter to Owners. http://sjcivil.net/sjcc/dear-owner-no-change-orders-thank-you/
Embed this episode
NOW PLAYING
Dear Owner, No Change Orders Thank You
0:00
10:07
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Build America Podcast?
This episode is 10 minutes long.
When was this Build America Podcast episode published?
This episode was published on April 23, 2020.
Can I download this Build America Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!