Delta Conveyance Project Part 4 - State Water Contractors
from The Drop Hosted by Eastern Municipal Water District
In Part 4 of our Delta Conveyance Project series, we sit down with Jennifer Pierre, General Manager of the State Water Contractors, to discuss her candid perspective on the project and her organization’s role in this monumental effort.
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of The Drop?
This episode is 46 minutes long.
When was this The Drop episode published?
This episode was published on March 25, 2026.
Can I download this The Drop episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.