EPISODE · Sep 30, 2020 · 23 MIN
Den laddade frågan om Northvolt
from Technokratin
Så mycket av elektrifieringen hänger på batteriutvecklingen. I veckan tog Northvolt in 5,5 miljarder kronor i en ny runda och värderas nu till 32,5 miljarder – utan att ha byggt ett enda batteri. Hosted on Acast. See acast.com/privacy for more information.
Embed this episode
NOW PLAYING
Den laddade frågan om Northvolt
0:00
23:33
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Technokratin?
This episode is 23 minutes long.
When was this Technokratin episode published?
This episode was published on September 30, 2020.
Can I download this Technokratin episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!