EPISODE · Jul 25, 2025 · 40 MIN
Design-Build at 14,000 Feet: How a “Small” Federal Project Redefined Possibility on Pikes Peak
from Design-Build Delivers · host DBIA
Have thoughts? Text us! What does it take to deliver a mission-critical federal facility atop one of the most extreme environments in the U.S.? In this episode, we head to Colorado’s Pikes Peak to explore the award-winning High Altitude Research Lab, a 4,000-square-foot facility rebuilt under intense weather, logistical and design constraints. Joe Opyd shares how his team used design-build to meet the moment and what this “small” project reveals about trust, flexibility and collaboration.Guest: Joe Opyd, CCM, DBIA, Sr. Project Manager / Project Controls Manager, DPR Construction Member, DBIA Federal CommitteeTopics Covered:Using design-build for small but complex federal projectsDelivering in extreme environments (wind, lightning, altitude)Stakeholder collaboration and city-federal partnershipsLong funding timelines and design constraintsSafety planning and logistics at 14,000 feetHow DBIA principles supported project successRelated Links:High Altitude Research Laboratory Project Summary and photos.Register for DBIA’s Federal Sector Design-Build Industry Days. Public and private Owners attend free, and UBEs receive discounted registration.Explore the DBIA Projects Database to learn more about HARL and other successful design-build projects.Ahead of the 2025 Project/Team Award announcement (coming soon), get to know past DBIA Project/Team Award Winners.Access all our free design-build resources and learn more about Design-Build Done Right® at dbia.org. DBIA members are shaping the future, one successful collaboration at a time.
What this episode covers
Have thoughts? Text us! What does it take to deliver a mission-critical federal facility atop one of the most extreme environments in the U.S.? In this episode, we head to Colorado’s Pikes Peak to explore the award-winning High Altitude Research Lab, a 4,000-square-foot facility rebuilt under intense weather, logistical and design constraints. Joe Opyd shares how his team used design-build to meet the moment and what this “small” project reveals about trust, flexibility and collaboration. Gu...
NOW PLAYING
Design-Build at 14,000 Feet: How a “Small” Federal Project Redefined Possibility on Pikes Peak
No transcript for this episode yet
Similar Episodes
Apr 21, 2026 ·13m
Apr 19, 2026 ·16m
Apr 17, 2026 ·13m
Apr 13, 2026 ·11m
Apr 11, 2026 ·16m