Detroit Catholic Central George and Mary Turek Hall of Science, CAM’s 2025 Project of the Year episode artwork

EPISODE · Apr 21, 2026 · 49 MIN

Detroit Catholic Central George and Mary Turek Hall of Science, CAM’s 2025 Project of the Year

from CAM Building Michigan Podcast · host Construction Association of MI

In Season 5, Episode 2 of the Building Michigan podcast, we delve into the crafting of Detroit Catholic Central’s new George and Mary Turek Hall of Science, which received CAM’s 2025 Project of the Year Award. The $51 million, 57,000-square-foot STEM facility was designed and built, respectively, by CAM members Integrated Design Solutions and J.S. Vig Construction.

Episode metadata supplied by the publisher feed · Published Apr 21, 2026

Embed this episode

Ready to play

Detroit Catholic Central George and Mary Turek Hall of Science, CAM’s 2025 Project of the Year

0:00 49:52

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of CAM Building Michigan Podcast?

This episode is 49 minutes long.

When was this CAM Building Michigan Podcast episode published?

This episode was published on April 21, 2026.

Can I download this CAM Building Michigan Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!