Developer Makes the Case for a 40 Million Dollar Fairgrounds Project in Leominster episode artwork

EPISODE · Jul 5, 2025 · 25 MIN

Developer Makes the Case for a 40 Million Dollar Fairgrounds Project in Leominster

from Radio Worcester’s Talk of the Commonwealth · host stolzhank

Proposed $40M Fairgrounds in Leominster Sparks Debate Over Jobs, Traffic, and Community Impact Local developer James Whitney outlines plans for a multi-use facility featuring horse racing, a sports bar, and year-round public events on a long-capped landfill.

Episode metadata supplied by the publisher feed · Published Jul 5, 2025

Embed this episode

Ready to play

Developer Makes the Case for a 40 Million Dollar Fairgrounds Project in Leominster

0:00 25:56

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Radio Worcester’s Talk of the Commonwealth?

This episode is 25 minutes long.

When was this Radio Worcester’s Talk of the Commonwealth episode published?

This episode was published on July 5, 2025.

Can I download this Radio Worcester’s Talk of the Commonwealth episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!