Skip to content
Dig Indy Tunnel Project episode artwork

EPISODE · Jul 17, 2018 · 54 MIN

Dig Indy Tunnel Project

from No Limits · host WFYI 90.1 FM

The two billion dollar Dig Indy project to divert sewer overflow from Indianapolis waterways is underway and led by Citizens Energy. Our guests to discuss the project are John Trypus, Director of Underground Engineering & Construction, and Nick Maynard, Construction Specialist.

Episode metadata supplied by the publisher feed · Published Jul 17, 2018

Embed this episode

Ready to play

Dig Indy Tunnel Project

0:00 54:02

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of No Limits?

This episode is 54 minutes long.

When was this No Limits episode published?

This episode was published on July 17, 2018.

Can I download this No Limits episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!