DNI METALS - IMPORTANT PROJECT UPDATES episode artwork

EPISODE · Dec 8, 2017 · 27 MIN

DNI METALS - IMPORTANT PROJECT UPDATES

from Proven and Probable · host Maurice Jackson

Dan Weir the Executive Chairman of DNI Metals sits down with Maurice Jackson of Proven and Probable to discuss the merits of being a shareholder in the what has the makings of being the world's lowest cost graphite producer.  We will provide project updates and discuss the issuance of a Letter of Default to Cougar Metals.  Specifically, Mr. Weir will provide a historical context of Graphite in saprolite soil which is generously abundant throughout both the Vohitsara and Marafody Projects.  We will address carbon, carbon content, graphite purity, flake size, logistics, drilling, trenching, bulk sampling, 43-101's, Resource Study, PEA's, Feasibility Study, Pilot Plant, Laboratory, and Environmetal Survey's on the Vohitsara Project and we will provide shareholders updates on the new acquired Marofody Project.  We will also discover what keeps Mr. Weir up at night that we don't know about! www.dnimetals.com website: https://www.provenandprobable.com youtube: https://www.youtube.com/c/provenandprobable.com twitter: https://twitter.com/provenprobable

Episode metadata supplied by the publisher feed · Published Dec 8, 2017

Embed this episode

Ready to play

DNI METALS - IMPORTANT PROJECT UPDATES

0:00 27:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Proven and Probable?

This episode is 27 minutes long.

When was this Proven and Probable episode published?

This episode was published on December 8, 2017.

Can I download this Proven and Probable episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!