DOT's Tom Buchholz 7/16/19
from AM Fox Valley Hosted by Dave Edwards
It's almost done...the 10-441 Tri County Project, and Project Mgr. Tom Buchholz gives us a status report and an update on the future I-41 widening from Highway 96 to Schuering Road in De Pere.
Embed this episode
No transcript yet.
Frequently asked questions
How long is this episode of AM Fox Valley?
This episode is 7 minutes long.
When was this AM Fox Valley episode published?
This episode was published on July 16, 2019.
Can I download this AM Fox Valley episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.