Douglas pushes back on scaled-down road plan tied to new port episode artwork

EPISODE · May 16, 2025 · 13 MIN

Douglas pushes back on scaled-down road plan tied to new port

from On The Border · host Herald/Review Media

Douglas city leaders are making a big ask in Washington, $20 million to fully fund the road connecting their new commercial port of entry to State Route 80. Without it, they say the port’s potential could be bottlenecked from day one. In today’s episode, we break down what’s at stake, what the scaled-back road plan would mean for cross-border trade, and why Mayor Jose Grijalva and his team say now is the time to get it right.Support the show: https://www.myheraldreview.com/site/forms/subscription_services/See omnystudio.com/listener for privacy information.

Episode metadata supplied by the publisher feed · Published May 16, 2025

Embed this episode

NOW PLAYING

Douglas pushes back on scaled-down road plan tied to new port

0:00 13:59

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of On The Border?

This episode is 13 minutes long.

When was this On The Border episode published?

This episode was published on May 16, 2025.

Can I download this On The Border episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!