Drainage Exposed 2: Was the Drainage Project Sabotaged?
from P.A. Political Revolution Podcast Hosted by David Jones
Drainage Exposed 2: Was the Drainage Project Sabotaged? Previous council (2018) set a blueprint for drainage projects that had a collaboration with DD7, engineers, COPA, and Colonial Pipeline. Projects were either funded through FEMA if possible, or through Capital Improvement Projects. Either way projects should have started mid 2019. Project delays and lies about funding during council and Mayor Bartie's hatred for the city purchasing property for the retention pond leads citizens to believe that drainage project was sabotaged. https://youtu.be/UQyIF0YW81k