Skip to content
Drainage Exposed 2: Was the Drainage Project Sabotaged? episode artwork

Sep 13, 2022 44 min

Drainage Exposed 2: Was the Drainage Project Sabotaged?

from P.A. Political Revolution Podcast Hosted by David Jones

Drainage Exposed 2: Was the Drainage Project Sabotaged? Previous council (2018) set a blueprint for drainage projects that had a collaboration with DD7, engineers, COPA, and Colonial Pipeline. Projects were either funded through FEMA if possible, or through Capital Improvement Projects. Either way projects should have started mid 2019. Project delays and lies about funding during council and Mayor Bartie's hatred for the city purchasing property for the retention pond leads citizens to believe that drainage project was sabotaged. https://youtu.be/UQyIF0YW81k

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Drainage Exposed 2: Was the Drainage Project Sabotaged?

0:00 44:46

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of P.A. Political Revolution Podcast?

This episode is 44 minutes long.

When was this P.A. Political Revolution Podcast episode published?

This episode was published on September 13, 2022.

Can I download this P.A. Political Revolution Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.