E2152: Will Largest ICE Raid At Hyundai-LG Site Cause Major Disruptions? 9/9 episode artwork

EPISODE · Sep 9, 2025 · 1H

E2152: Will Largest ICE Raid At Hyundai-LG Site Cause Major Disruptions? 9/9

from Wayne Dupree Podcast

ICE conducted the largest single-site raid at Hyundai-LG’s $7.6B Georgia battery plant, detaining 475 workers, including 300 South Koreans. Construction paused as U.S.-Korea talks secured releases, though some procedures remain pending as of Sept. 7, 2025.See Privacy Policy at https://art19.com/privacy and California Privacy Notice at https://art19.com/privacy#do-not-sell-my-info.Discover other shows on the Talk Red Podcast Network, and get your daily fix of news, sports, and entertainment at https://TalkRed.com.DISCLAIMER: Some elements of this podcast may include AI-generated content, such as cover thumbnail images, show descriptions and some background audio. Hosted on Acast. See acast.com/privacy for more information.

Episode metadata supplied by the publisher feed · Published Sep 9, 2025

Embed this episode

NOW PLAYING

E2152: Will Largest ICE Raid At Hyundai-LG Site Cause Major Disruptions? 9/9

0:00 1:00:42

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Wayne Dupree Podcast?

This episode is 1 hour and 0 minutes long.

When was this Wayne Dupree Podcast episode published?

This episode was published on September 9, 2025.

Can I download this Wayne Dupree Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!