Skip to content
E24: Top 3 things to validate before removing test or inspection steps episode artwork

Mar 3, 2021 12 min

E24: Top 3 things to validate before removing test or inspection steps

from Lean Six Sigma Bursts Hosted by Brion Hurley

I share an article I wrote back in Dec 2013 about reducing or eliminating test or inspection steps using Six Sigma analysis methods of capability and stability, along with risk mitigation tools like FMEA and error proofing. Links Article: Top 3 things to validate before removing test or inspection steps Article: Which Should You Use Cpk or Ppk? BIZ-PI.com LeanSixSigmaDefinition.com

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

E24: Top 3 things to validate before removing test or inspection steps

0:00 12:02

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Lean Six Sigma Bursts?

This episode is 12 minutes long.

When was this Lean Six Sigma Bursts episode published?

This episode was published on March 3, 2021.

Can I download this Lean Six Sigma Bursts episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.