EPISODE · Jul 1, 2007 · 5 MIN
Earned Value Project Management
from 5 Minutes Podcast with Ricardo Vargas · host Ricardo Viana Vargas
In this podcast Ricardo Vargas talks about the main concepts involved in the earned value analysis. This podcast was recorded only in Brazilian Portuguese. The link below is for the Brazilian Portuguese version.
Embed this episode
Ready to play
Earned Value Project Management
0:00
5:20
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of 5 Minutes Podcast with Ricardo Vargas?
This episode is 5 minutes long.
When was this 5 Minutes Podcast with Ricardo Vargas episode published?
This episode was published on July 1, 2007.
Can I download this 5 Minutes Podcast with Ricardo Vargas episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!