EPISODE · Jun 25, 2026 · 1 MIN
East Main Bridge Replacement Set for 2028
from Nashville News Today | 2 Min News | The Daily News Now!
Franklin’s historic East Main Street bridge, a century-old landmark, is getting a full replacement—set to finish by July 2028. Expect one lane in each direction starting this summer, with sidewalks fully closed in year two. Though still safe for school buses and daily traffic, this proactive upgrade aims to prevent future emergencies, replacing the six-span structure with a four-span design to improve flood flow. With downtown already buzzing from the Margin District and new city hall projects, TDOT is coordinating to minimize chaos. Drivers: plan ahead and check traffic updates to dodge delays. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/4740a07be93e3c10
Embed this episode
NOW PLAYING
East Main Bridge Replacement Set for 2028
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.