East Main Bridge Replacement Set for 2028 episode artwork

EPISODE · Jun 25, 2026 · 1 MIN

East Main Bridge Replacement Set for 2028

from Nashville News Today | 2 Min News | The Daily News Now!

Franklin’s historic East Main Street bridge, a century-old landmark, is getting a full replacement—set to finish by July 2028. Expect one lane in each direction starting this summer, with sidewalks fully closed in year two. Though still safe for school buses and daily traffic, this proactive upgrade aims to prevent future emergencies, replacing the six-span structure with a four-span design to improve flood flow. With downtown already buzzing from the Margin District and new city hall projects, TDOT is coordinating to minimize chaos. Drivers: plan ahead and check traffic updates to dodge delays. Support the show:Get a discount at https://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/4740a07be93e3c10

Episode metadata supplied by the publisher feed · Published Jun 25, 2026

Embed this episode

NOW PLAYING

East Main Bridge Replacement Set for 2028

0:00 1:43

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Nashville News Today | 2 Min News | The Daily News Now!?

This episode is 1 minute long.

When was this Nashville News Today | 2 Min News | The Daily News Now! episode published?

This episode was published on June 25, 2026.

Can I download this Nashville News Today | 2 Min News | The Daily News Now! episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!