EPISODE · Aug 11, 2026 · 1 MIN
Eglinton Crosstown Tunnel Breakthrough | Toronto News
from Toronto News Today | 2 Min News | The Daily News Now!
Tunnelling for the Eglinton Crosstown LRT’s westward extension to Pearson Airport is complete, marking a major milestone for Toronto’s transit future. With two tunnels broken through near Jane Street, the underground work on the eastern leg is now finished — connecting to the six-kilometer stretch already built west of the Humber River. The new Martin Grove station will spur housing and job growth, while the full 9.2-kilometer extension will eventually link to Mississauga, adding seven stations and stretching Line 5 to 29 kilometers. Commuters could save up to 24 minutes between downtown and Square One, boosting regional connectivity with UP Express, GO Transit, and Mississauga’s network. Listen in comfort:Get a discount on a Soli Pillow: http://solipillow.com/discount/dnn. Advertise on DNN:[email protected] This is an automated, high-level news summary based on public reporting.Report issues to [email protected]. View sources & latest updates:https://sources.thednn.ai/271dadd7e58e010b
Embed this episode
NOW PLAYING
Eglinton Crosstown Tunnel Breakthrough | Toronto News
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.