EPISODE · Jan 22, 2019 · 54 MIN
Ekip & Proje Yönetimi Arda Mendeş
from Dijital Atölye & Pazarlama Sohbetleri · host BoostROAS
📚BoostAcademy'nin 7. bölümünde, Demirören Medya Dijital Pazarlama Grup Müdürü Arda Mendeş ile ekip & proje yöneten herkesin altını çizecek notlar çıkartacağı, deneyim dolu bir sohbet gerçekleştirdik 🐿
Embed this episode
Ready to play
Ekip & Proje Yönetimi Arda Mendeş
0:00
54:51
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Dijital Atölye & Pazarlama Sohbetleri?
This episode is 54 minutes long.
When was this Dijital Atölye & Pazarlama Sohbetleri episode published?
This episode was published on January 22, 2019.
Can I download this Dijital Atölye & Pazarlama Sohbetleri episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!