Electrification, battery trains, third rail – Finding solutions for South Western Railway’s network episode artwork

EPISODE · Nov 5, 2024 · 23 MIN

Electrification, battery trains, third rail – Finding solutions for South Western Railway’s network

from Green Signals · host Green Signals Productions

Electrification and battery technology are never far from discussions about decarbonisation of the railway. There are a number of solutions, including discontinuous electrification and battery-hybrid technology. We visited Salisbury Traincare Depot, home to South Western Railway’s Class 159 fleet. Richard speaks to Neil Drury, Engineering & Infrastructure Director for SWR about how the operator is thinking about the electrification challenge on its network. In this episode: (00:00) Intro (01:21) How is the work on the Isle of Wight’s Island Line going? (02:35) Weather challenges at Honiton Tunnel and elsewhere (04:10) Vegetation encroachment onto the railway (05:34) Future for the West of England Line (08:21) More third rail? (11:38) Is the plan for West of England similar to GWR’s Greenford Branch plans? (13:30) Is it feasible to retrofit current rolling stock? (17:07) How about retrofitting Electric Multiple Units instead of buying new trains? (18:38) SWR could be one of the first operations to be nationalised next year… (20:28) What customers feel and will see (22:12) Introduction of Arterio trains Membership: If you want to see even more from Green Signals, including exclusive content, become a member and support the channel further too. YouTube - ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://www.youtube.com/@GreenSignals/join⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ Patreon - ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://www.patreon.com/GreenSignals⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ Green Signals: Website - ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠http://www.greensignals.org⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ Newsletter - ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠http://www.greensignals.org/#mailing-list⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ Follow: X (Twitter) - ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://twitter.com/greensignallers⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ LinkedIn - ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://www.linkedin.com/company/green-signals-productions-ltd⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ Instagram - ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠https://instagram.com/greensignallers⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠ Credits: Presenters - Nigel Harris (@railnigel on X) & Richard Bowker CBE (@SRichardBowker). General Manager: Stef Foster (@stefatrail)

Episode metadata supplied by the publisher feed · Published Nov 5, 2024

Embed this episode

NOW PLAYING

Electrification, battery trains, third rail – Finding solutions for South Western Railway’s network

0:00 23:18

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Green Signals?

This episode is 23 minutes long.

When was this Green Signals episode published?

This episode was published on November 5, 2024.

Can I download this Green Signals episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!