Skip to content
Electrifying Maine’s Working Waterfront episode artwork

EPISODE · Nov 13, 2025 · 30 MIN

Electrifying Maine’s Working Waterfront

from Let's Connect · host WMPG

Host Tom Bell heads out on Casco Bay—at least in spirit—to explore the Heron, the largest electric aquaculture workboat in Maine and maybe the nation. Built through a multi-year collaboration among local innovators, Heron is transforming oyster farming with cleaner, quieter, zero-emission technology that offers a glimpse into the future of Maine’s working waterfront. Tom is joined by Nick Planson of Shred Electric, Willy Leathers of Maine Ocean Farms, and Lia Morris of the Island Institute, to talk about how Heron performs on the water, and why electrification matters for coastal communities, climate goals, and the future of sustainable aquaculture. Video of the Heron

Episode metadata supplied by the publisher feed · Published Nov 13, 2025

Embed this episode

Ready to play

Electrifying Maine’s Working Waterfront

0:00 30:03

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Let's Connect?

This episode is 30 minutes long.

When was this Let's Connect episode published?

This episode was published on November 13, 2025.

Can I download this Let's Connect episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!