EPISODE · Jul 31, 2012 · 15 MIN
Elk River Trail
from Happy Trails · host KHUM: Radio Without The Rules
Cliff and Emily talke with Kevin Wright, Senior Planner with the Redwood Community Action Agency about the Elk River Trail: Where we are now, what is being worked on, what is the future of the trail and how will it connect with the rest of the area's proposed regional trail system.
Embed this episode
Ready to play
Elk River Trail
0:00
15:03
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Happy Trails?
This episode is 15 minutes long.
When was this Happy Trails episode published?
This episode was published on July 31, 2012.
Can I download this Happy Trails episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!