Skip to content
Elk River Trail episode artwork

EPISODE · Jul 31, 2012 · 15 MIN

Elk River Trail

from Happy Trails · host KHUM: Radio Without The Rules

Cliff and Emily talke with Kevin Wright, Senior Planner with the Redwood Community Action Agency about the Elk River Trail: Where we are now, what is being worked on, what is the future of the trail and how will it connect with the rest of the area's proposed regional trail system.

Episode metadata supplied by the publisher feed · Published Jul 31, 2012

Embed this episode

Ready to play

Elk River Trail

0:00 15:03

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Happy Trails?

This episode is 15 minutes long.

When was this Happy Trails episode published?

This episode was published on July 31, 2012.

Can I download this Happy Trails episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!