Energy Decision # 36 - Curtailment Clauses Explained: An Impossible Choice for Data Centers

from Energy Answers with Daniel Burke · host Daniel Burke

Behind-the-meter load curtailment clauses in data center and large-load interconnection agreements are now a standard condition of faster grid access across PJM, ERCOT, and SPP — and the operators signing these agreements are often doing so without fully understanding the curtailment hierarchy, collateral requirements, or operational design implications buried inside them. This is Energy Decision #36 in the complete C&I energy management series from Tactical Energy Group. 100 decisions. Every one that matters. In this episode, Daniel Burke covers: Why interconnection queues are overwhelmed and why curtailment acceptance has become the price of speed-to-market for large loads. The PJM curtailment hierarchy: Interim NITS, Non-Capacity-Backed Load (NCBL), and traditional load — and why your position in that stack is the most operationally important term in your agreement. Texas SB 6 mandatory curtailment requirements for loads at or above 75 MW interconnected after December 31, 2025. SPP's three-tiered flexible interconnection structure: CHILLS, PALS, and the five-minute full curtailment requirement. The emerging large-load tariff archetype: collateral, minimum bills, contract terms, and exit provisions tracked across recent utility filings. Why the AEP Ohio "instantaneous curtailment synced to local power output" requirement is an engineering mandate buried in a legal document. BTM gas LCOE versus 4-hour BESS as curtailment coverage — and why duration sizing is market- and weather-specific. The FERC Co-Location Technical Conference and why the window for bilateral negotiation may be narrowing. The Bring-Your-Own-Generation (BYOG) fast-track framework and what it changes about the negotiation. Who this is for: hyperscale and colocation data center operators, large greenfield industrial manufacturers, and crypto mining and EV charging facility decision-makers evaluating curtailable interconnection service in exchange for faster grid access. If you are trying to decide whether to accept mandatory curtailment provisions in your interconnection agreement — and how to design operations to survive forced load reduction events without compromising critical workloads — this episode is built for you. Read the full breakdown on behind-the-meter load curtailment clauses at tac-nrg.com If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at blueprint.tac-nrg.com. Visit tac-nrg.com for more practical tools and the Energy Decision Blueprint for qualified Indiana C&I operators. 0:00 – What are behind-the-meter load curtailment clauses? 1:30 – Why interconnection queues are overwhelmed: ERCOT 198 GW, PJM capacity shortfall 3:00 – The PJM curtailment hierarchy: Interim NITS, NCBL, traditional load 4:30 – ERCOT SB 6 mandatory curtailment for loads 75 MW and above 5:30 – SPP PALS: five-minute full curtailment requirement 6:30 – The large-load tariff archetype: collateral, minimum bills, contract duration, exit fees 8:00 – BTM gas LCOE versus 4-hour BESS for curtailment coverage 9:30 – FERC rulemaking signals: the closing window for bilateral negotiation 11:00 – The decision framework: which curtailment structure, at what MW, backed by what BTM stack

Episode metadata supplied by the publisher feed · Published Sep 14, 2026

Embed this episode

Ready to play

Energy Decision # 36 - Curtailment Clauses Explained: An Impossible Choice for Data Centers

0:00 10:14

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Energy Answers with Daniel Burke?

This episode is 10 minutes long.

When was this Energy Answers with Daniel Burke episode published?

This episode was published on September 14, 2026.

Can I download this Energy Answers with Daniel Burke episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!