Energy Decision # 50 - BTM Generation Metering Configuration Explained: Net, Gross, and Parallel episode artwork

EPISODE · Oct 2, 2026 · 10 MIN

Energy Decision # 50 - BTM Generation Metering Configuration Explained: Net, Gross, and Parallel

from Energy Answers with Daniel Burke · host Daniel Burke

Behind-the-meter generation metering configuration (specifically the election between net, gross, and parallel metering) is one of the most consequential and least-scrutinized decisions in any C&I on-site generation or storage project.This is Energy Decision #50 in the complete C&I energy management series from Tactical Energy Group. 100 decisions. Every one that matters.In this episode, Daniel Burke covers:What the utility meter actually is as a legal and commercial boundary, and why that boundary governs every metering election downstream.Net metering mechanics: how bidirectional meters work, what they credit, and what they do not offset (demand charges, standby charges).Gross metering and production meters: why certain incentive programs require total generation measurement, not net exchange.Parallel metering: how independent generation and load measurement enables demand charge management and grid services settlement that net metering cannot support.The four value streams affected by metering configuration: bill savings, incentive program revenue, REC and capacity credit value, and grid services revenue.Standby charges: the cost variable most vendors omit from their financial models, and how metering configuration determines whether they apply and how they're calculated.Tariff lock-in and net metering policy erosion: what happens when a state moves from retail-rate net metering to avoided-cost net billing mid-project.Dual-meter configuration as a standard C&I pattern for operators pursuing both bill savings and incentive compliance.Episode 7 connection: why standby charge exposure is directly tied to your metering election.Who this is for: plant managers, facility managers, operations executives, and CFOs at manufacturing facilities, cold storage operations, healthcare campuses, commercial real estate portfolios, and municipalities who are planning or evaluating a behind-the-meter generation or storage project.If you're trying to figure out which metering configuration to elect for your behind-the-meter installation to maximize bill savings, preserve REC and capacity credit value, and avoid standby charges over the tariff lock-in period, this episode is built for you.Read the full breakdown on behind-the-meter generation metering configuration at tac-nrg.com/behind-the-meter-generation-metering-configuration.If you're an Indiana C&I operator actively evaluating this decision, get your free Energy Decision Blueprint at blueprint.tac-nrg.com.Visit tac-nrg.com for more practical tools and the Energy Decision Blueprint for qualified Indiana C&I operators.00:00 Understanding Metering Configurations02:43 Net vs. Gross Metering Explained04:51 The Importance of Metering Choices07:49 Navigating Utility Agreements and Charges

Episode metadata supplied by the publisher feed · Published Oct 2, 2026

Embed this episode

Ready to play

Energy Decision # 50 - BTM Generation Metering Configuration Explained: Net, Gross, and Parallel

0:00 10:23

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Energy Answers with Daniel Burke?

This episode is 10 minutes long.

When was this Energy Answers with Daniel Burke episode published?

This episode was published on October 2, 2026.

Can I download this Energy Answers with Daniel Burke episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!