Engineering Resilience: JP Robinette on the Transformative Sites Reservoir Project episode artwork

EPISODE · Dec 10, 2024 · 54 MIN

Engineering Resilience: JP Robinette on the Transformative Sites Reservoir Project

from The Water Zone · host The Toro Company

JP Robinette, Engineering & Construction Manager for the Sites Reservoir Project, discusses his role in overseeing the construction and management of this innovative 15-million-acre-foot off-stream reservoir. Designed to capture rainfall and runoff from extreme storms, the reservoir will provide a flexible water supply for California's communities, farms, and environment during times of scarcity. Once integrated with the California State Water Project and Central Valley Project, it will improve water management during floods and droughts while delivering key environmental benefits, such as 372,029 acre-feet of water for ecological use, increased Delta freshwater flows, and cold water for salmon in the Sacramento River. Podcast Recorded on December 5, 2024

Episode metadata supplied by the publisher feed · Published Dec 10, 2024

Embed this episode

Ready to play

Engineering Resilience: JP Robinette on the Transformative Sites Reservoir Project

0:00 54:01

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Water Zone?

This episode is 54 minutes long.

When was this The Water Zone episode published?

This episode was published on December 10, 2024.

Can I download this The Water Zone episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!