Skip to content
Environmental Permitting episode artwork

EPISODE · Nov 11, 2024 · 32 MIN

Environmental Permitting

from HRBT Tunnel Talk

A new bridge-tunnel project like the HRBT Expansion starts with environmental permitting. And for this project, there are more than 22 permits that require various levels of approval and constant monitoring. That responsibility for VDOT falls with Larissa Ambrose, the project's environmental manager. In this edition of HRBT Tunnel Talk, we learn from Larissa about the many challenges of her job.

Episode metadata supplied by the publisher feed · Published Nov 11, 2024

Embed this episode

Ready to play

Environmental Permitting

0:00 32:15

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of HRBT Tunnel Talk?

This episode is 32 minutes long.

When was this HRBT Tunnel Talk episode published?

This episode was published on November 11, 2024.

Can I download this HRBT Tunnel Talk episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!