Ep.1 - Construction Scheduling & Takt Construction
from Takt Construction Hosted by Jason Schroeder & Kevin Rice
In this episdode Kevin and Jason introduce the podcast, provide an overview of Takt, and map a plan for the future this podcast. Listen in as they cover: 1. What is the current state of construction scheduling? 2. What is the Takt Production System? 3. What has and has not been working in our industry? 4. Why should construction professionals care about scheduling?
Embed this episode
No transcript yet.
Similar podcasts
The Regular Man Podcast
The Regular Man Podcast
Welcome to the Regular Man Podcast, where we celebrate God's gift of masculinity in the life of the Regular Man. Here, there are no pastors, no pretense, and no pandering. Just interesting conversation, realistic expectations, and practical advice for the regular man. Steve Cruz is the host of The Regular Man Podcast, created specifically for the regular, hard-working, blue-collar man. He’s a husband and father who believes men should embrace God’s gift of masculinity and live a life of Christian virtue. Steve learned the value of hard work, integrity, and respect through an upbringing of cars, construction, and a cadre of strong hardened men. As a military veteran and law enforcement officer, Steve understands the value of speaking directly and plainly on subject matters that are, far too often, nuanced to death by the modern-day Christian Church. As the host of The Regular Man Podcast, Steve has down-to-earth
The AEC Leadership Podcast
Anthony Fasano, P.E., AEC PM, F. ASCE & Rebecca Swabey, P. Eng
Leadership in architecture, engineering and construction comes with its own set of challenges, and technical leaders at all stages of their career need support and guidance. The AEC Leadership Podcast (AECLP) is dedicated to helping engineering leaders of all experience levels navigate these challenges. With a diverse audience of AEC professionals across various disciplines, The AECLP provides valuable insights and practical advice.
Digital Builder
Autodesk
The Digital Builder podcast is for construction professionals working on the forefront of construction. If you are looking for conversations centered on where the industry is headed, this podcast is for you! Each episode features an interview with top construction professionals discussing themes related to connected construction and the future of the construction industry.
The AEC Project Management Podcast
Anthony Fasano, P.E., AEC PM, F. ASCE & Fiona Johann, PMP, AEC PM
The AEC Engineering Project Management Podcast (AECPM) provides engineering career advice and success stories for project managers in the architecture, engineering, and construction (AEC) industry. Civil engineer and project manager Anthony Fasano, P.E., AEC PM hosts the podcast, which highlights engineering project managers and professionals.
Frequently asked questions
How long is this episode of Takt Construction?
This episode is 47 minutes long.
When was this Takt Construction episode published?
This episode was published on November 23, 2022.
Can I download this Takt Construction episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.