Ep 101: Mark Flaherty, Calvert Cliffs Nuclear Plant episode artwork

EPISODE · Oct 22, 2018 · 42 MIN

Ep 101: Mark Flaherty, Calvert Cliffs Nuclear Plant

from Titans Of Nuclear | Interviewing World Experts on Nuclear Energy · host Titans of Nuclear

In this episode we discuss...  Mark's background and family history in the nuclear field Mark's work as Site Vice President at Calvert Cliffs The origin and evolution of PRA (Probabilistic Risk Assessment) Differences between two-loop combustion reactors and two-loop Westinghouse reactors Commonalities in auxiliary systems between pressurized water and boiling water reactors Common challenges that occur in everyday plant operations Advantages and considerations around building power plants near natural water sources Fostering a culture of open dialogue and inclusion within the plant Strategies for lengthening time between outages and shortening overall outage time Regulation and deregulation within the nuclear industry Improving cost efficiency of nuclear power

Episode metadata supplied by the publisher feed · Published Oct 22, 2018

Embed this episode

NOW PLAYING

Ep 101: Mark Flaherty, Calvert Cliffs Nuclear Plant

0:00 42:46

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Titans Of Nuclear | Interviewing World Experts on Nuclear Energy?

This episode is 42 minutes long.

When was this Titans Of Nuclear | Interviewing World Experts on Nuclear Energy episode published?

This episode was published on October 22, 2018.

Can I download this Titans Of Nuclear | Interviewing World Experts on Nuclear Energy episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!