Ep.1024 - Setting up Your Space. Steps 11-15 - Field Engineering Series
from Elevate Construction Hosted by Jason Schroeder
Jason continues the field engineer steps with steps 11 through 15: ordering survey equipment, setting up the bullpen, building a testing area, calibrating equipment, and setting up the total station and data collector. He also explains why healthy conflict and accountability only work inside a core team, and announces that the surveyors book is now on audio. What you'll learn in this episode: Why a core team needs proximity and trust before healthy conflict and accountability Which survey equipment every builder team should have Why engineers should sit together in an open bullpen How to set up an equipment testing area using Chapter 10 of the field engineering manual What to set up in the total station and data collector Have you set up a place where your equipment gets tested and calibrated? If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw
Embed this episode
No transcript yet.