Skip to content
Ep.1146 - Answers to Questions - Last Planner Alignment episode artwork

Aug 16, 2024 10 min

Ep.1146 - Answers to Questions - Last Planner Alignment

from Elevate Construction Hosted by Jason Schroeder

Are You Wasting Time With Outdated Pull Planning? Too many construction teams are stuck transferring sticky notes into Excel, duplicating work, and misaligning schedules with reality. In this episode, I respond directly to a listener's question about how Last Planner® is being used in the field vs. how it should be used. We dig into: ✅ Why sticky notes and physical boards aren't a "Lean requirement" ✅ How to align master schedules, pull plans, and weekly work plans without wasting trade partner time ✅ Why vertical alignment (from macro plans to daily handoffs) is the real secret to flow ✅ Tech tools and smarter processes that eliminate duplication and keep teams focused If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode. And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊). Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

Ep.1146 - Answers to Questions - Last Planner Alignment

0:00 10:04

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of Elevate Construction?

This episode is 10 minutes long.

When was this Elevate Construction episode published?

This episode was published on August 16, 2024.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.