Ep 115: Joshua Rhodes on the ERCOT Data Center Bubble, Rate Pressure, and What Business Leaders Are Missing episode artwork

EPISODE · Jun 16, 2026 · 51 MIN

Ep 115: Joshua Rhodes on the ERCOT Data Center Bubble, Rate Pressure, and What Business Leaders Are Missing

from Renewable Rides · host Gareth Evans & Dan Roberts

If the data is this clear, why are so many business leaders still getting energy wrong? In this episode, Dr. Joshua Rhodes, research scientist at the University of Texas at Austin, nonresident fellow at Columbia University's Center on Global Energy Policy, and CTO of IdeaSmiths, brings the kind of clarity that only comes from building the most detailed independent models of the ERCOT grid in existence.Joshua called the data center interconnection queue a bubble in 2025, when it stood at 220 gigawatts. It's now at 435, and 90% of it is data centers trying to connect to a grid that has never delivered more than 85.5 gigawatts at one time.Listen in as Joshua explains why that bubble is already pushing transformer costs up 200% and wire costs up 180%, why those infrastructure bills will land on ratepayers for decades, and why renewables have quietly saved Texans tens of billions in electricity costs. He also breaks down the counterintuitive relationship between oil prices, natural gas supply, and your electricity bill, and makes the case for why transmission, not generation, is the piece of the energy puzzle that most executives aren't even asking about yet.What You’ll Learn in Today’s Episode:Why the ERCOT data center queue is a bubble.How infrastructure inflation is driving up energy rates.Why renewables act as a hedge against fuel price volatility.How oil prices can actually lower natural gas costs.The three parts of the grid and which one matters most.Why transmission is the hardest piece to build.How distributed batteries are reshaping grid dynamics.Why data centers need to become smarter energy consumers.The real cost of blocking renewables in Texas.What business leaders are missing about the energy transition.Resources in Today's Episode:Joshua Rhodes: LinkedInThe Energy Capital PodcastIdeaSmithsGareth Evans: LinkedInDan Roberts: LinkedInVECKTA: NewsYou can view a video of the conversation on VECKTA's website here: https://tinyurl.com/rmwhk4p9

Episode metadata supplied by the publisher feed · Published Jun 16, 2026

Embed this episode

If the data is this clear, why are so many business leaders still getting energy wrong? In this episode, Dr. Joshua Rhodes, research scientist at the University of Texas at Austin, nonresident fellow at Columbia University's Center on Global Energy Policy, and CTO of IdeaSmiths, brings the kind of clarity that only comes from building the most detailed independent models of the ERCOT grid in existence. Joshua called the data center interconnection queue a bubble in 2025, when it stood at 220 ...

Distinct summary based on available episode metadata or transcript content.

Ready to play

Ep 115: Joshua Rhodes on the ERCOT Data Center Bubble, Rate Pressure, and What Business Leaders Are Missing

0:00 51:57

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Renewable Rides?

This episode is 51 minutes long.

When was this Renewable Rides episode published?

This episode was published on June 16, 2026.

Can I download this Renewable Rides episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!