Ep.1154 - Last Planner without First Planner Results in Disrepsect episode artwork

EPISODE · Aug 27, 2024 · 6 MIN

Ep.1154 - Last Planner without First Planner Results in Disrepsect

from Elevate Construction · host Jason Schroeder

In this podcast we cover: Answers to listener comments. What the Last Planner System is. Why we need a First Planner System. In this episode, I share why the last planner system cannot succeed without the first planner system. I explain how planning in preconstruction provides the logistical support, supply chain readiness, and production design that allows field teams to make reliable commitments. I also discuss misconceptions in the lean community where some experts downplay early planning, and why this approach creates disrespect and overburden. By walking through the relationship between first planner and last planner, I highlight how both must work together to create a true lean system. Whether you are new to lean construction or a seasoned practitioner, this episode will help you see why predictive planning and collaborative planning are not opposites but partners in building successful projects. If you like the Elevate Construction podcast, please subscribe for free and you'll never miss an episode.  And if you really like the Elevate Construction podcast, I'd appreciate you telling a friend (Maybe even two 😊).   Also, here are links to our YouTube Channels: · Jason Schroeder YouTube Channel: https://www.youtube.com/channel/UC4xpRYvrW5Op5Ckxs4vDGDg · LeanTakt YouTube Channel: https://www.youtube.com/c/leanTakt · LeanSuper YouTube Channel: https://www.youtube.com/channel/UCzQDevqQP19L4LePuqma3Fg/featured · LeanSurvey YouTube Channel: https://www.youtube.com/channel/UC-Ztn3okFhyB_3p5nmMKnsw  

Episode metadata supplied by the publisher feed · Published Aug 27, 2024

Embed this episode

NOW PLAYING

Ep.1154 - Last Planner without First Planner Results in Disrepsect

0:00 6:42

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Elevate Construction?

This episode is 6 minutes long.

When was this Elevate Construction episode published?

This episode was published on August 27, 2024.

Is there a transcript available for this episode?

Yes, a full transcript is available for this episode. You can read the complete transcript on the episode page.

Can I download this Elevate Construction episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!